Lebanon is a tiny country in the Middle East that is developing quickly. Its operations are heavily reliant on energy resources. This article aims to clarify the list of power plants in Lebanon that can assist in supplying the country with its energy demands. Both governmental and commercial power plants are included in the list. The majority of public plants are solar and water powered, while the majority of private facilities are diesel-fired. The plants can produce electricity for either residential or commercial use, and their sizes and capacities vary. To guarantee the preservation of the legal framework necessary for the safe and effective running of the plants, contract agreements have also been negotiated with the pertinent technical service providers. This page will shed light on Lebanon’s power plants’ ownership, location, installed capacity, and manner of operation.
The list of all nuclear, hydroelectric, solar, wind, oil, and gas power stations in Lebanon is shown below.
List of all Power Plants in Lebanon in table format
We have made the following table, which includes a list of all the power plants in Lebanon, for the convenience of our readers:
Powerplant Name | PowerPlant Capacity(MW) | Power Plant Location via to Latitude and Longitude | Fuel Type- Primary | Estimated Power Generation(GWH) |
---|---|---|---|---|
Deir Ammar | 470 | 34.465, 35.8942 | Gas | N/A |
Hreishi | 70 | 34.3795, 35.7584 | Oil | N/A |
Jieh 1 | 347.5 | 33.6475, 35.3996 | Oil | N/A |
Sour | 35 | 33.2761, 35.2289 | Oil | N/A |
Zahrani | 470 | 33.4961, 35.338 | Gas | N/A |
Zouk 1 | 642.8 | 33.969, 35.604 | Oil | N/A |
Information Source: GEODB, WRI
Best Power Plants in Lebanon in 2023
Below is information on Lebanon’s top power plant:
Powerplant Baalback Reviews
The Baalback power plant is situated in Lebanon’s Baalback city. Its main fuel source is oil, and it has an installed generation capacity of 35 MW. It started operating at the start of 2021. It is anticipated that Baalback will significantly enhance Lebanon’s electrical supply with the additional capacity. In addition, it is anticipated that the plant will produce clean, dependable energy to assist satisfy the nation’s expanding energy needs.
In addition to supplying Lebanon with energy, this power plant lessens its reliance on foreign fuel. Its location, at 34.0209 N and 36.1919 E, offers both high efficiency energy supply and access to the region’s wealth of natural resources. Furthermore, it is ideally situated close to important transportation hubs, which facilitates the delivery of operating supplies and gasoline. This guarantees that the region’s energy needs are satisfied while also improving the power plant’s affordability and convenience.
Powerplant Deir Ammar Reviews
The coordinates of Lebanon’s Deir Ammar power plant are 34.465 latitude and 35.8942 longitude. This power station uses natural gas as its primary fuel and has an installed capacity of 470MW. The power plant was built in 2007 and is projected to produce 600 GWh of electricity per year. Additionally, the Deir Ammar power station in Lebanon has energy-efficient and renewable resource-adopting technology installed.
Modern Uniflow engines, which minimize pollutants and use natural gas effectively, power the power plant and produce cheap, dependable electricity. Comparing the plant to other similar plants, its high plant efficiency of 54.9% represents a better efficiency rate. Furthermore, Lebanon’s Deir Ammar power plant offers a dependable supply of electricity, which is essential for the development of the nation’s economy and the wellbeing of its citizens.
Powerplant Hreishi Reviews
Hreishi is a power station in Lebanon that can produce up to 70 megawatts of electricity. At 34.3795 latitude and 35.7584 longitude are its coordinates. The Hreishi Power Plant was inaugurated in June 2019 and is mostly powered by oil.
Four power units make up the power plant. Every one of them has a boiler to make steam and a steam turbine to produce energy. The four separate electric power units are combined into two groups, and each group is connected to an outbound power distribution line with 110 wires and a 750kV transformer that converts direct current to alternating current.
In addition to producing energy, the primary goal of the Hreishi Power Plant is to increase the security of the power supply by enhancing the dependability of the power distribution infrastructure. It also feeds the national grid with dependable and efficient power supply. It is contributing significantly to the energy supply system of the nation by supplying electricity to about 550,000 households in Lebanon.
Powerplant Jieh 1 Reviews
Jieh 1 powerplant, the first combined phas gas cycle powerhouse in Lebanon, is situated there. The plant is situated at coordinates 33.6475 and 35.3996 and has a 347.5 MW capacity. Being the first of its type in the nation, Jieh 1 is an oil-based power plant that uses oil as its main fuel source. Since June 2007, the facility has been producing energy, with an expected yearly output of 100 GWh.
In all of Lebanon, Jieh 1 has the largest power plant capacity. With three supply units, each producing 117 MW, the plant’s overall capacity can power hundreds of thousands of homes across the nation. With its generation of commercial and household electricity, it has expanded to become an essential component of the local economy. The power plant, which can supply the area with dependable and reasonably priced electricity, is situated in the southern portion of the nation and is easily accessible.
Powerplant Sour Reviews
Sour Power Plant is a 35 MW oil-fueled power plant situated in Sour city, Lebanon. The power plant’s precise coordinates are 33.2761 N and 35.2289 E. It was constructed in 2020 and is expected to generate 35 MW of power.
The sole oil-powered plant in Lebanon is called Sour Power Plant. Oil is its primary fuel, producing an estimated 35 MW. The power plant serves as a significant national energy source in addition to providing Sour City with the electricity it needs. The power plant has diesel engines, water tanks, pumps, separators, oil-fired boilers, and other technologies that guarantee the effective use of its resources.
The purpose of the power plant was to ease the burden on Lebanon’s electrical grid. Additionally, it helps the nation meet its renewable energy target of having 25% of its energy come from renewable sources by 2030. With oil serving as the main fuel, the Sour Power Plant’s overall efficiency is predicted to be between 80 and 90 percent.
Powerplant Zahrani Reviews
The first gas-powered power plant in Lebanon is called Zahrani Power Plant. Zahrani is capable of producing 18.1 GWh of electricity continuously and has a capacity of 470 MW. The plant’s coordinates are 33.4961 latitude and 35.338 longitude, which place it in South Lebanon. Being one of the biggest power plants in the area, it was constructed in 2009.
Zahrani is one of the most productive power stations in the Mediterranean because to its thirty distinct gas turbines. Its main energy source is natural gas, which is also the most dependable and reasonably priced energy supply in the area. Zahrani’s primary fuel source is natural gas, hence it emits no harmful gases into the environment, making it environmentally benign.
Currently expected to produce roughly 21% of the nation’s total electricity supply, Zahrani is owned and operated by Electricite du Liban, the government-owned power company in Lebanon. The Power Plant will eventually be expanded to reach a capacity of 860 MW.
Powerplant Zouk 1 Reviews
The coordinates of Zouk Power Plant in Lebanon are 33.969 latitude and 35.604 longitude. It has a 642.8 MW power plant capacity and was inaugurated on a certain date. Its main energy source is oil, and the plant is predicted to generate a significant amount of power. It is a cutting-edge facility that provides a significant amount of the nation’s energy needs. It is outfitted with energy-saving technologies.
With its long history of operation and recent upgrade, the Power Plant helps Lebanon become more energy-efficient and less carbon-footprint-positive by utilizing the least amount of fuel to produce the greatest quantity of energy. With hundreds of workers engaged in either its direct operations or its supplier chain, it is also a significant employer. The Zouk Power Plant has demonstrated remarkable performance, which has been attributed to its effective utilization of resources in conjunction with well-managed operations.
FAQ
Q. How many power plants are there in Lebanon?
A. There are twelve power plants in Lebanon at the moment, and many more are under construction. The majority of these facilities, which are largely fossil fuel-powered, are found in the country’s coastal and northern regions.
Q. What fuel sources are used in power plants in Lebanon?
A. Diesel is the primary fuel used in Lebanon’s power plants, while some also use gas and fuel oil. Additionally, a tiny portion of energy comes from renewable sources including geothermal, wind, and solar power.
Q. Has Lebanon increased its capacity in recent years?
A. Yes, via the installation of more solar energy plants, the development of new natural gas resources, and the use of more sophisticated plants, Lebanon has recently boosted its capacity. The overall capacity has increased from 1,500 MW to about 2,000 MW thanks to these initiatives.
Q. What is Lebanon’s main source of electricity?
A. Power plants provide the majority of the electricity in Lebanon; hydroelectric plants and renewable energy sources like solar and wind also contribute to the country’s electricity supply. In addition, the electricity grid is supplemented by generation from diesel and fuel oil.
Q. How has Lebanon managed to increase its energy efficiency?
A. By utilizing high-efficiency generators, enhancing the transmission network, and lowering energy losses, Lebanon has increased its energy efficiency. The government has also launched energy-saving programs like reduced tariffs and subsidies in addition to increasing investments in renewable energy sources.
I hope you find the information on all the power plants in Lebanon provided above interesting. If you do, please leave a comment.
Cory Combs is the Lead Writer and a key contributor at PowerPlantForum.com, a top resource for energy professionals and enthusiasts. With over a decade of experience in power plant operations and a degree in Electrical Engineering, Cory is a recognized authority in the field. His expertise in optimizing energy systems is informed by extensive hands-on experience and research. Follow Cory for the latest updates and expert insights on Instagram.